Client
Mountain Top Foods Ltd.
Sector
Specialty Industrial
Location
Nanton, AB
Contract Type
Stipulated Price
Prime Consultant
Tower Engineering Group
Size
18,000 Sq. Ft.
Budget
$6,320,000
Completed
2016
About
New 18,000ft2 greenfield CRA Compliant food processing plant. Construction consisted of galvanized structural steel framing, insulated metal panel walls to ceiling, epoxy-coated floors, and temporary equipment openings. Collaborated/coordinated installation of owner-supplied refrigeration and food processing equipment valued at $7,000,000.
Value engineering and proactive problem-solving were paramount throughout the project as the equipment procurement process was executed and coordinated with the base building. The utilities room includes a steam and thermal boiler, water treatment, compressor, hot water generation skid, sanitation, and electrical distribution.
